{{textbox|Infiltration facilities can be effective on low permeability soils with infiltration rates ≤ 15 mm/hr:
{{textbox|Infiltration facilities can be effective on low permeability soils with infiltration rates ≤ 15 mm/hr:
*See [[Underdrains| underdrains]] and
*See [[Underdrains| underdrains]] and
*Results from STEP studies of infiltration practices on [[low permeability soils]]
*Results from STEP studies of infiltration facilities located on [[low permeability soils]] in Ontario.
Infiltration facilities should be designed with modifications where:
Infiltration facilities should be designed with modifications where:
#the underlying bedrock is within 1 m below the bottom of the proposed BMP, or
#the underlying bedrock is within 1 m below the bottom of the proposed BMP, or