Line 67: |
Line 67: |
| | | | | |
| |- | | |- |
| |'''BMP Installation''' – after installation of pipes/sewers, prior to backfilling | | |rowspan="4"|'''BMP Installation''' – after installation of pipes/sewers, prior to backfilling |
| |Excavation location, footprint, depth and slopes are acceptable | | |Structural components (e.g., foundation, walls) installed according to plans, if applicable |
| | | | | |
| |- | | |- |
| |Excavated soil is stockpiled outside the CDA | | |Impermeable liner installed correctly, if applicable |
| | | | | |
| |- | | |- |
| |Embankments/berms (elevations, slopes, compaction) are acceptable | | |Installations of sub-drain pipes (e.g., locations, elevations, slopes), standpipes/monitoring wells are acceptable |
| | | | | |
| |- | | |- |
| |Excavation bottom and sides roughened to reduce smearing and compaction | | |Sub-drain trench dams installed correctly (location, elevation) |
| | | | | |
| |- | | |- |
| |'''Landscaping''' – after final grading, prior to planting | | |rowspan="4"|'''Landscaping''' – after final grading, prior to planting |
| |Excavation location, footprint, depth and slopes are acceptable | | |Filter bed depth and surface elevations at inlets are acceptable |
| | | | | |
| |- | | |- |
| |Excavated soil is stockpiled outside the CDA | | |Maximum surface ponding depth is acceptable |
| | | | | |
| |- | | |- |
| |Embankments/berms (elevations, slopes, compaction) are acceptable | | |Filter bed is free of ruts, local depressions and not overly compacted |
| | | | | |
| |- | | |- |
| |Excavation bottom and sides roughened to reduce smearing and compaction | | |Planting material meets approved planting plan specifications (plant types and quantities) |
| |
| |
| |} | | |} |
|
| |
|