==Construction Tasks Described==
==Construction Tasks Described==
Verification of Siting and LID Design
Installation of ESC and Construction Fencing
ESC Inspection and Maintenance (ongoing)
Clearing and Grubbing
Excavation
Rough Grade
Verification of Grading/Survey*
Scarification                                         
Geotextile                                                           
Impermeable liner                               
Underdrain
Overflow or Overflow Drain                                     
Monitoring well                               
Storage Reservoir
Stone Choker  Layer                     
Curbing                                                 
Pre-treatment and Inlet                 
Soil Media / Filter Media
Finish Grading
Riprap (Large Stone)                       
Plant Material Verification and Installation
Mulch Placement                                                               
Stabilizing Contributing Drainage Area  - Planting Adjacent Vegetation
As-built Survey
Permanent Fencing                                         
Identify and Address Deficiencies
Assumption/Certification


==Key Construction Inspection Points==
==Key Construction Inspection Points==