Changes

Jump to navigation Jump to search
No change in size ,  2 years ago
Line 435: Line 435:
*In extreme cases, removal of the affected portion of the surface course and bedding and reinstallation with materials that meet design specifications may be necessary.
*In extreme cases, removal of the affected portion of the surface course and bedding and reinstallation with materials that meet design specifications may be necessary.
|-
|-
|'''[[Enhanced Swales]] / [[Vegetated filter strips]] & [[Absorbent landscapes|Soil Amendment Areas]]''' (topsoil surface)  
|'''[[Enhanced swales]] / [[Vegetated filter strips]] & [[Absorbent landscapes|Soil Amendment Areas]]''' (topsoil surface)  
|i < 15 mm/h;
|i < 15 mm/h;
K<sub>S</sub> < 1.5 x 10-6 cm/s
K<sub>S</sub> < 1.5 x 10-6 cm/s

Navigation menu