Line 533: |
Line 533: |
| #Determine the drainage time from the water level measurements | | #Determine the drainage time from the water level measurements |
| #Calculate the infiltration rate based on water level measurements once flow from the subdrain has stopped as the change in storage volume over time divided by the infiltration area. | | #Calculate the infiltration rate based on water level measurements once flow from the subdrain has stopped as the change in storage volume over time divided by the infiltration area. |
| #If more than 13 m<sup>3</sup> of water (i.e., the typical capacity of water tanker trucks) is needed to fill the sub-surface water storage reservoir, a fire hydrant will need to be used as the water source. | | #If more than 13 m<sup>3</sup> of water (i.e., the typical capacity of water tanker trucks) is needed to fill the sub-surface water storage reservoir, a fire hydrant will need to be used as the water source.<br> |
| | <br> |
|
| |
|
| For infiltration BMPs that contain unrestricted sub-drains, continuous monitoring to evaluate drainage performance should capture the full drainage periods for at least one storm event large enough to completely fill the sub-surface water storage reservoir to the elevation of the sub-drain pipe invert or at least 3 rain events between 15 and 25 mm in depth. | | For infiltration BMPs that contain unrestricted sub-drains, continuous monitoring to evaluate drainage performance should capture the full drainage periods for at least one storm event large enough to completely fill the sub-surface water storage reservoir to the elevation of the sub-drain pipe invert or at least 3 rain events between 15 and 25 mm in depth. |
Line 539: |
Line 540: |
| *Alternatively, a simulated storm event test can be performed, using the stepwise procedure described above. | | *Alternatively, a simulated storm event test can be performed, using the stepwise procedure described above. |
|
| |
|
| For further in-depth details on continuous monitoring best practices | | For further information regarding natural and simulated storm event testing, acceptance criteria per LID BMP type and associated testing tools and protocols scroll down to the embedded 2016 guide below. |
|
| |
|
| ==Green Roof Irrigation System Testing== | | ==Green Roof Irrigation System Testing== |