Changes

Jump to navigation Jump to search
Line 481: Line 481:

===Acceptance Criteria===  
===Acceptance Criteria===  
Acceptance criteria for LID BMP drainage performance for both natyural and simulated storm event testing:
Acceptance criteria for LID BMP drainage performance for both natural and simulated storm event testing:
{{textbox|
{{textbox|
# Water flows into the BMP as intended;
# Water flows into the BMP as intended;

Navigation menu