Line 481:
Line 481:
===Acceptance Criteria===
===Acceptance Criteria===
Acceptance criteria for LID BMP drainage performance for both natyural and simulated storm event testing:
Acceptance criteria for LID BMP drainage performance for both natural and simulated storm event testing:
{{textbox|
{{textbox|
# Water flows into the BMP as intended;
# Water flows into the BMP as intended;