Changes

Jump to navigation Jump to search
14 bytes added ,  2 years ago
no edit summary
Line 284: Line 284:
*In [[winter]] months salt should be applied efficiently along the top of slopes to allow melting snow to carry the salt solution down-gradient.
*In [[winter]] months salt should be applied efficiently along the top of slopes to allow melting snow to carry the salt solution down-gradient.
*Effective [[grading]] can also direct melt water towards strategically placed stormwater collection infrastructure (i.e. [[Overflow|catch basins]], [[Swales|vegetated swales]], [[bioretention]] features, [[Rain garden|landscaped areas]]), preventing salt application in heavy traffic areas that are also pathways for runoff.
*Effective [[grading]] can also direct melt water towards strategically placed stormwater collection infrastructure (i.e. [[Overflow|catch basins]], [[Swales|vegetated swales]], [[bioretention]] features, [[Rain garden|landscaped areas]]), preventing salt application in heavy traffic areas that are also pathways for runoff.
*The key to effective stormwater collection during winter is to ensure that melt water from high traffic areas or snow piles does not have to travel great distances to a collection point.<ref name="example8 /">
*The key to effective stormwater collection during winter is to ensure that melt water from high traffic areas or snow piles does not have to travel great distances to a collection point (LSRCA, 2017)<ref name="example8" />.


===Snow Pile Location===
===Snow Pile Location===

Navigation menu