Natural heritage features and existing vegetation || - Do the designs accurately capture existing natural heritage features? Which areas on the site should be protected during construction, and will these exclusion areas make the LID facility more difficult to construct? Where are the tree drip lines?
|Natural heritage features and existing vegetation || - Do the designs accurately capture existing natural heritage features? Which areas on the site should be protected during construction, and will these exclusion areas make the LID facility more difficult to construct? Where are the tree drip lines?
- Are there any invasive species on the site which could colonize the LID practice?
- Are there any invasive species on the site which could colonize the LID practice?


|-
|-
Access, sequencing, staging, and constructability ||- Where will the contractor access the site?  
|Access, sequencing, staging, and constructability ||- Where will the contractor access the site?  
- If applicable, where can materials and/or equipment be stored
- If applicable, where can materials and/or equipment be stored