*Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
*Backfill or sling material from outside of the LID facility at the lowest possible speed to avoid loss of component material.
*Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
*Apply material in 150-300 mm lifts until the desired elevation and thickness, allowing for positive flow.
*Wet material between lifts, allowing for drying before backfilling/slinging another lift
*Wet material between lifts, allowing for drying before backfilling/slinging another lift.


Key Inspection Points:
Key Inspection Points:
Line 366: Line 366:
Common Mistakes to Avoid:
Common Mistakes to Avoid:
*Use of wrong material that does not meet design specifications. If there are changes in the material, it must be approved by the supervisor or project manager.<br>   
*Use of wrong material that does not meet design specifications. If there are changes in the material, it must be approved by the supervisor or project manager.<br>   
 