Changes

Jump to navigation Jump to search
no edit summary
Line 22: Line 22:

<gallery mode="packed" widths=300px heights=300px>
<gallery mode="packed" widths=300px heights=300px>
geotextile-RS380I.jpg | Insert Caption
geotextile-RS380I.jpg | Geotextile rolled out on subgrade surface
geotextile-facility-side.jpg | Insert caption<br>
geotextile-facility-side.jpg | The shape of the LID feature required the geotextile to be rolled out prior to being laid on the subgrade surface<br>
geotextile-with-excess-and-granular.jpg | Insert caption
geotextile-with-excess-and-granular.jpg | Excess fabric is draped over the edges of the LID practice, and backfilling with granular is taking place
geotextile-backfill-underdrain.jpg | Insert caption
geotextile-backfill-underdrain.jpg | Footprint with geotextile, granular, and underdrain


</gallery>
</gallery>
426

edits

Navigation menu