Line 6: |
Line 6: |
| #Identify the type, diameter, and material of exposed utilities | | #Identify the type, diameter, and material of exposed utilities |
| #Include data on critical feature elevations and existing utilities, such as: | | #Include data on critical feature elevations and existing utilities, such as: |
| **Inverts of newly installed pipe | | ***Inverts of newly installed pipe |
| **Vertical and horizontal bends in pipes | | ***Vertical and horizontal bends in pipes |
| **Existing public utilities | | ***Existing public utilities |
| **Existing private utilities | | ***Existing private utilities |
| **New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<br> | | ***New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<br> |
|
| |
|
| Inspection Points:<br> | | Inspection Points:<br> |
| *Datum matches the pre-engineering survey or selected reference feature | | *Datum matches the pre-engineering survey or selected reference feature |
| *Data provided in as-built survey matches the as-built standards of the local municipality<br> | | *Data provided in as-built survey matches the as-built standards of the local municipality<br> |