Changes

Jump to navigation Jump to search
Line 439: Line 439:
<gallery mode="packed" widths=350px heights=350px>
<gallery mode="packed" widths=350px heights=350px>
Spot8 p2 20190820.JPG|Machinery placing mulch in a rain garden at Glendale Public School in Brampton, ON. Read about the Design and Build Overview in this [https://sustainabletechnologies.ca/app/uploads/2020/09/CVC-Glendale-Rain-Garden-Case-Study.pdf case study].
Spot8 p2 20190820.JPG|Machinery placing mulch in a rain garden at Glendale Public School in Brampton, ON. Read about the Design and Build Overview in this [https://sustainabletechnologies.ca/app/uploads/2020/09/CVC-Glendale-Rain-Garden-Case-Study.pdf case study].
ERI 2.jpg|Mulch layer as the final grade in the Hagger Ave bioswale project in Brampton, ON.
ERI 2.jpg|Mulch layer as the final grade in the Haggert Ave bioswale project in Brampton, ON.
IMG 0098-1.jpg|Elevation problem with the mulch at the end of this rain garden (Mineola P.S.), not allowing for the water to fully enter the rain garden and causing ponding in this low spot.
IMG 0098-1.jpg|Elevation problem with the mulch close to the end of this rain garden at Mineola P.S. This elevation is not allowing runoff to fully enter the rain garden and causing ponding in this low spot.
</gallery>
</gallery>


Navigation menu