| ====As-built Surveys==== | | ====As-built Surveys==== |
| Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion of a post-construction as-built survey is a standard operating procedure for engineering projects that captures any changes made to the feature’s design during construction.<br> | | Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion of a post-construction as-built survey is a standard operating procedure for engineering projects that captures any changes made to the feature’s design during construction. |
|
| |
|
| '''Survey Steps:'''<br> | | '''Survey Steps:''' |
| #Use the same datum as the pre-engineering survey. | | #Use the same datum as the pre-engineering survey. |
| #If a pre-engineering survey is not available, use a reference feature as the datum. | | #If a pre-engineering survey is not available, use a reference feature as the datum. |
Line 11: |
Line 11: |
| ***Existing public utilities | | ***Existing public utilities |
| ***Existing private utilities | | ***Existing private utilities |
| ***New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<br> | | ***New and existing structures (e.g., catchbasins, manholes, chambers, etc.) |
|
| |
|
| '''Inspection Points:'''<br> | | '''Inspection Points:''' |
| *Datum matches the pre-engineering survey or selected reference feature. | | *Datum matches the pre-engineering survey or selected reference feature. |
| *Data provided in as-built survey matches the as-built standards of the local municipality.<br> | | *Data provided in as-built survey matches the as-built standards of the local municipality. |