Changes

Jump to navigation Jump to search
m
Line 81: Line 81:
{{:Construction: communication, inspection plan, and utilities coordination}}
{{:Construction: communication, inspection plan, and utilities coordination}}


'''Erosion and sediment controls, construction limits, natural heritage protection,  and perimeter controls'''<br>
{{:Construction: erosion and sediment control measures}}
 
{|class="wikitable" style="width: 1280px"
|+'''Bioretention/Swales: Key Components, Descriptions and Routine I&M Requirements'''
|-
!style="width: 500px"|Comnponent
!style="width: 1500px"|Description
!style="width: 1500px"|Inspection & Maintenance Tasks
!style="width: 500px"|<span style="color:green">('''Pass''')</span> Photo Example
!style="width: 550px"|<span style="color:red">('''Fail''')</span> Photo Example
|-
|'''[[Bioretention: Sizing|Contributing Drainage Area (CDA)]]'''
|
Area(s) from which runoff directed to the BMP originates; includes both impervious and pervious areas.
|
*Remove trash, debris and sediment from pavements (biannually to quarterly) and eavestroughs (annually);
*Replant or seed bare soil areas as needed.
|[[File:Pass.PNG|300px|thumb|center|CDA has not changed in size or land cover. Sediment, trash or debris is not accumulating and point sources of contaminants are not visible.]]
|[[File:Fail bio.PNG|280px|thumb|center|Size of the CDA has changed from design assumptions. A point source for contaminants is visible (i.e. lack of sediment controls on adjacent construction site). (Photo Source: North Carolina Cooperative Extension)]]
|}


[[File:Fail bio.PNG|280px|thumb|center|]]
[[File:Fail bio.PNG|280px|thumb|center|]]
722

edits

Navigation menu