Changes

Jump to navigation Jump to search
no edit summary
Line 4: Line 4:
'''Construction Steps:'''
'''Construction Steps:'''
#Connect the overflow drain to the underdrain.
#Connect the overflow drain to the underdrain.
#Fit a metal, domed grate to the overflow.
#Install overflow pit to grade at the location specified in the contract documents.
#Install overflow pit to grade at the location specified in the contract documents.
#Fit a metal, domed grate to the overflow.


'''Key Inspection Points:'''
'''Key Inspection Points:'''
426

edits

Navigation menu