===Pre-construction: communication, inspection plan, and utilities coordination===
===Pre-construction: communication, inspection plan, and utilities coordination===
{| class="wikitable floatright" style="width: 300px"
{| class="wikitable floatright" style="width: 200px"
|+ Be sure to verify all design changes
|+ Be sure to verify all design changes
|-
|-
Line 23: Line 23:
*verification processes for field changes to the design and material substitutions
*verification processes for field changes to the design and material substitutions


The table below expands upon the bullets above and provides helpful guidance on communication topics at the pre-construction meeting. Given the lead-up time needed for testing requirements of specified materials, these discussions should occur soon after the contract is awarded, ideally 2 months prior to project construction.  
The table below expands upon the bullets above and provides helpful guidance on communication topics at the pre-construction meeting. Given the lead-up time needed for testing requirements of specified materials, these discussions should occur soon after the contract is awarded, ideally 2 months prior to project construction.  
 


{|class="wikitable"
{|class="wikitable"