Changes

Jump to navigation Jump to search
Created page with "===Erosion and sediment control inspection and maintenance=== ESC measures require ongoing attention to ensure integrity and performance. ESC inspections should take place, at minimum, during installation, after rainfall events, and at the critical inspection points discussed in the Pre-construction: communication, inspection plan, and utilities coordination section. At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the..."
===Erosion and sediment control inspection and maintenance===

ESC measures require ongoing attention to ensure integrity and performance. ESC inspections should take place, at minimum, during installation, after rainfall events, and at the critical inspection points discussed in the [[Pre-construction: communication, inspection plan, and utilities coordination]] section.

At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the project's staging plan, and potential failure points.
722

edits

Navigation menu