Excavation to the sub-grade will differ depending on whether the design is for an infiltrating or a non-infiltrating LID system. If it’s an infiltrating practice, the sub-grade should be as level as possible to promote even infiltration across the facility’s footprint. For non-infiltrating practices, excavate sub-grade slopes to the design grade in the direction of the underdrain, typically 1 to 5%. | Excavation to the sub-grade will differ depending on whether the design is for an infiltrating or a non-infiltrating LID system. If it’s an infiltrating practice, the sub-grade should be as level as possible to promote even infiltration across the facility’s footprint. For non-infiltrating practices, excavate sub-grade slopes to the design grade in the direction of the underdrain, typically 1 to 5%. |