Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:
The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices with a vegetated surface layer. By definition this includes [[bioswale|bioswales]], [[rain garden|rain gardens]], [[bioretention|bioretention gardens]], and [[enhanced swale|enhanced swales]]. Depending on the design, the surface layer of infiltration [[infiltration chambers|chambers]], [[infiltration trench|trenches]], and [[soakaways]] may also be vegetated.
{{TOClimit|2}}
==Overview==
==Overview==
 
[[File:construction process.jpg|400px|thumb|right|The five-step construction process for ground-level LIDs.]]
''insert blurb here''
This section gives guidance for project managers, engineers, and contractors on the excavation and grading steps required for successful construction of sub-surface and ground-level LID practices.


==Soil media and amendments==
==Soil media and amendments==
722

edits

Navigation menu