Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:
[[File:construction process.jpg|400px|thumb|right|The five-step construction process for sub-surface and ground-level LIDs.]]
The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices: [[bioretention|bioretention gardens]], [[bioswales]], [[rain gardens]], [[exfiltration trenches]], [[enhanced swales]], [[permeable pavements]], [[infiltration trenches]], [[infiltration chambers]], and [[soakaways]].  
The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices: [[bioretention|bioretention gardens]], [[bioswales]], [[rain gardens]], [[exfiltration trenches]], [[enhanced swales]], [[permeable pavements]], [[infiltration trenches]], [[infiltration chambers]], and [[soakaways]].  


Line 4: Line 6:

==Overview==
==Overview==
[[File:construction process.jpg|400px|thumb|right|The five-step construction process for ground-level LIDs.]]
 
This section gives guidance for project managers, engineers, and contractors on the excavation and grading steps required for successful construction of sub-surface and ground-level LID practices.
This section gives guidance for project managers, engineers, and contractors on the excavation and grading steps required for successful construction of sub-surface and ground-level LID practices.


722

edits

Navigation menu