#Maintenance and rehabilitation costs over a 50 year time period for the Minimum Frequency maintenance scenario are estimated to be 2.04 and 1.48 times the original construction costs for the 10 cm and 15 cm with membrane designs, respectively. | #Maintenance and rehabilitation costs over a 50 year time period for the Minimum Frequency maintenance scenario are estimated to be 2.04 and 1.48 times the original construction costs for the 10 cm and 15 cm with membrane designs, respectively. |