Changes

Jump to navigation Jump to search
Line 15: Line 15:
*the contributing drainage area is stabilized before the LID practice becomes operational;
*the contributing drainage area is stabilized before the LID practice becomes operational;
*environmentally sensitive areas and the LID practices themselves are protected during construction; and
*environmentally sensitive areas and the LID practices themselves are protected during construction; and
*inlet, outlet, pretreatment, and piped elements have the correct elevations and inverts.   
*[[inlet]], [[outlet]], [[pretreatment]], and piped elements have the correct elevations and inverts.   


Furthermore, keeping records of these inspections helps to certify the works after construction and makes for a smooth assumption process.
Furthermore, keeping records of these inspections helps to certify the works after construction and makes for a smooth assumption process.


==Construction stages and LID types==
==Construction stages and LID types==

Navigation menu