Changes

Jump to navigation Jump to search
m
Line 56: Line 56:
==Excavation and grading==
==Excavation and grading==


[[File:Excavation belfountain swale.JPG|200px|thumb|right|Excavation of a rain garden at Belfountain Public School, Caledon, Ontario. (Photo source: CVC)]]
[[File:Excavation belfountain swale.JPG|400px|thumb|right|Excavation of a rain garden at Belfountain Public School, Caledon, Ontario. (Photo source: CVC)]]
   
   
Excavation and grading are necessary for installing LID practices with sub-surface components, re-grading land to hold more water, and re-routing overland flow routes into an LID practice. The [[Excavation and grading|excavation and grading]] page gives guidance on:  
Excavation and grading are necessary for installing LID practices with sub-surface components, re-grading land to hold more water, and re-routing overland flow routes into an LID practice. The [[Excavation and grading|excavation and grading]] page gives guidance on:  
722

edits

Navigation menu