Changes

Jump to navigation Jump to search
m
Line 265: Line 265:

In tandem with installation of ESC measures, setting up access and staging areas is one of the first steps in any construction project. Perimeter controls such as construction fencing are often combined with silt fencing. Safety fencing may be needed to restrict public access to the site, especially if the site sees lots of pedestrian traffic. Together, construction fencing and structural ESC measures should demarcate:  
In tandem with installation of ESC measures, setting up access and staging areas is one of the first steps in any construction project. Perimeter controls such as construction fencing are often combined with silt fencing. Safety fencing may be needed to restrict public access to the site, especially if the site sees lots of pedestrian traffic. Together, construction fencing and structural ESC measures should demarcate:  
*the limits of construction  
*limits of construction  
*heavy equipment routes
*heavy equipment routes
*equipment and material storage areas  
*equipment and material storage areas  
Line 273: Line 273:

'''Construction steps'''
'''Construction steps'''
#Install perimeter fencing/silt fence in alignment with design drawings and ESC plan.
#Install perimeter fencing/sediment fence in alignment with design drawings and ESC plan.
#Demarcate staging and access points with fencing or surface markings in alignment with design drawings.
#Demarcate staging and access points with fencing or surface markings in alignment with design drawings.
'''Key inspection points'''
'''Key inspection points'''
722

edits

Navigation menu