Changes

Jump to navigation Jump to search
m
no edit summary
Line 3: Line 3:
The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices with a vegetated surface layer. By definition this includes [[bioswale|bioswales]], [[rain garden|rain gardens]], [[bioretention|bioretention gardens]], and [[enhanced swale|enhanced swales]]. Depending on the design, the surface layer of [[exfiltration trenches]] and infiltration [[infiltration chambers|chambers]], [[infiltration trench|trenches]], and [[soakaways]] may also be vegetated.
The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices with a vegetated surface layer. By definition this includes [[bioswale|bioswales]], [[rain garden|rain gardens]], [[bioretention|bioretention gardens]], and [[enhanced swale|enhanced swales]]. Depending on the design, the surface layer of [[exfiltration trenches]] and infiltration [[infiltration chambers|chambers]], [[infiltration trench|trenches]], and [[soakaways]] may also be vegetated.


For guidance on LID practices with permeable pavement surfaces, see the [[Finishing grades and surface layer installation: permeable pavements]] page.
For guidance on LID practices with permeable pavement surfaces, see the [[Finishing grades and surface layer installation: permeable pavements|finishing grades and surface layer installation: permeable pavements]] page.


{{TOClimit|2}}
{{TOClimit|2}}
722

edits

Navigation menu