Changes

Jump to navigation Jump to search
Line 86: Line 86:
==Finishing grades and surface layer installation==
==Finishing grades and surface layer installation==


[[File:Planting CVC Janet I McDougald.JPG|400px|thumb|right|CVC and Toronto Zoo staff planting the surface layer of a rain garden at Janet I McDougald Public School in Mississauga, Ontario. (Photo source: CVC)]]
[[File:Planting CVC Janet I McDougald.JPG|400px|thumb|right|CVC and Toronto Zoo staff planting the surface layer of a rain garden at Janet I McDougald Public School in Mississauga, Ontario. (Photo source: CVC, 2021)]]


This construction stage differs between LID practice type. The [[finishing grades and surface layer installation: vegetated LIDs]] page has guidance for vegetated LIDs, and the [[finishing grades and surface layer installation: permeable pavements]] page has guidance for and non-vegetated LIDs. In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.   
This construction stage differs between LID practice type. The [[finishing grades and surface layer installation: vegetated LIDs]] page has guidance for vegetated LIDs, and the [[finishing grades and surface layer installation: permeable pavements]] page has guidance for and non-vegetated LIDs. In many cases the surface of infiltration systems will be traditional asphalt, concrete, or pavers; STEP does not provide guidance on installing non-permeable surfaces.   

Navigation menu