Changes

Jump to navigation Jump to search
no edit summary
Line 21: Line 21:

STEP encourages feedback on the LCCT from users and they can provide them below on this page or here at the team's email address: STEP@trca.ca
STEP encourages feedback on the LCCT from users and they can provide them below on this page or here at the team's email address: STEP@trca.ca
==Practice-specific Life Cycle Costs==
You can find practice-specific life cycle costs per LID BMP as listed below. Each page provides a brief overview of the practice and highlights a design summary cost breakdown discussing construction costs, life cycle costs total, retrofits and operation and maintenance costs associated over both 25 and 50-yr scenarios.
To read more about assumed costs of deign, construction, O&M and associated life cycle costs for each of the modeled LID practices, please see below:
*[[LID LCCT: Bioretention]]
*[[LID LCCT: Permeable Pavements]]
*[[LID LCCT: Enhanced Swales]]
*[[LID LCCT: Vegetated Filter Strips]]
*[[LID LCCT: Underground Infiltration Chamber]]
*[[LID LCCT: Infiltration Trench]]
*[[LID LCCT: Rainwater Harvesting]]
<small>'''Note''': All practices' costs are based off of a Contributing Drainage Area (CDA) of 2000m<sup>2</sup>.</small>

Navigation menu