Changes

Jump to navigation Jump to search
no edit summary
Line 27: Line 27:
<small>'''Note''': Bioretention (all 3 design scenarios): Includes pretreatment sump at inlet and assumes that rehabilitation of filter media bed is performed at 25 years.</small>
<small>'''Note''': Bioretention (all 3 design scenarios): Includes pretreatment sump at inlet and assumes that rehabilitation of filter media bed is performed at 25 years.</small>
==Construction Costs==
==Life Cycle Costs==
===25-Year life cycle cost break down===
===25-Year life cycle cost break down===
==Total Cost & Design Summary==
===Full Infiltration===
===Partial Infiltration===
===Non-Infiltrating/filtration only===


==References==
==References==

Navigation menu