Changes

Jump to navigation Jump to search
Line 30: Line 30:
==Construction Costs==
==Construction Costs==


[[File:Construction Breakdown Bio No Infil.PNG]]
[[File:Construction Breakdown Bio No Infil.PNG|700px]]


Above you can find a cost breakdown of a 250m<sup>2</sup> [[Stormwater planters|non-infiltrating/filtration only Bioretention]] practice best suited in an urban environment where infiltration into underlying native soils may not be possible due to heavy use of utilities below, contaminated soils, shallow bedrock, and/or Zero-lot-line developments such as condos or dense urban infill.
Above you can find a cost breakdown of a 250m<sup>2</sup> [[Stormwater planters|non-infiltrating/filtration only Bioretention]] practice best suited in an urban environment where infiltration into underlying native soils may not be possible due to heavy use of utilities below, contaminated soils, shallow bedrock, and/or Zero-lot-line developments such as condos or dense urban infill.

Navigation menu