Below are both the capital and life cycle costs of the three [[bioretention]] configuration practices over a 25 and 50-year time horizon based on a detailed assessment of local input costs, maintenance requirements, rehabilitation costs and design scenarios relevant to Canadian climates. The costs of maintenance and rehabilitation (Life cycle costs) are set at "Present Value" of these activities in 2022.
Looking at the pie charts below for each configuration we can see that they are all relatively close to being the same cost with a variation of a few hundred dollars between each over both a 25 and 50-year time horizon by
===25-Year life cycle cost break down===
===25-Year life cycle cost break down===
[[File:25yr LCCT Bio Full Infil.PNG|thumb|left|400px|'''Bioretention: Full infiltration''']]
[[File:25yr LCCT Bio No Infil.PNG|thumb|right|400px|''' Bioretention: Non-infiltrating''']]
[[File:25yr LCCT Bio Partial Infil.PNG|thumb|center|400px|'''Bioretention: Partial infiltration''']]