| ==Construction Costs== | | ==Construction Costs== |
|
| |
|
| [[File:Construction Breakdown Bio No Infil.PNG|thumb|right|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Retention''']] | | [[File:Construction Breakdown PP No Infil.PNG|thumb|right|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Retention''']] |
|
| |
|
| [[File:Construction Breakdown Bio Partial Infil.PNG|thumb|left|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Partial Infiltration Design, 25 mm Retention''']] | | [[File:Construction Breakdown PP Partial Infil.PNG|thumb|left|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Partial Infiltration Design, 25 mm Retention''']] |
|
| |
|
| [[File:Construction Breakdown Bio Full Infil.PNG|thumb|center|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Treatment''']] | | [[File:Construction Breakdown PP Full Infil.PNG|thumb|center|400px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']] |
|
| |
|
|
| |
|
Line 53: |
Line 53: |
|
| |
|
|
| |
|
| Above you can find a cost breakdown of a 250m<sup>2</sup> in three different configurations:<br> | | Above you can find a cost breakdown of a 1000m<sup>2</sup> in three different configurations:<br> |
| #[[Stormwater planters|non-infiltrating/filtration only Bioretention]], | | #[[Non-infiltrating/filtration only Permeable Pavement]], |
| #[[Bioretention: Partial infiltration]] | | #[[Partial infiltration Permeable Pavement]] |
| #[[Bioretention: Full infiltration]] | | #[[Full infiltration Permeable Pavement]] |
|
| |
|
| As can be seen the greatest cost for this practice (regardless of configuration type) will be Material & Installation, which include costly components such as the, [[Liner|impermeable membrane/liner]] appropriate [[planting]] and [[vegetation]] selection, [[underdrain]], [[filter media]] and the stone storage layer or [[Bioretention: Internal water storage|Internal water storage zone (IWSZ)]]. | | As can be seen the greatest cost for this practice (regardless of configuration type) will be Material & Installation, which include costly components such as the, [[Liner|impermeable membrane/liner]] appropriate [[planting]] and [[vegetation]] selection, [[underdrain]], [[filter media]] and the stone storage layer or [[Bioretention: Internal water storage|Internal water storage zone (IWSZ)]]. |