Below are capital and life cycle cost estimates for the three [[bioretention]] configurations over 25 and 50 year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values.  
Below are capital and life cycle cost estimates for the three [[bioretention]] configurations over 25 and 50 year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values.  


Looking at the pie charts below for each configuration we can see that they are all relatively close to being the same cost with a variation of a few hundred dollars between each over both a 25 and 50-year time horizon. The percentage of the [[Bioretention: Full infiltration|Full Infitlration]] configuration is greater than the other two due to the lesser cost of the overall installation for material and Installation, (no underdrains, no gravel storage layer or impermeable membrane, etc.).
 


===25-Year life cycle cost break down===
===25-Year life cycle cost break down===

Navigation menu