Line 12:
Line 12:
Additional components include an [[underdrain]] to remove excess water and soil additives to enhance [[Nutrients|pollutant removal]]. <br>
Additional components include an [[underdrain]] to remove excess water and soil additives to enhance [[Nutrients|pollutant removal]]. <br>
===STEP's LCCT Assumptions:===
Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations:
Design and operation and maintenance program assumptions used to generate cost estimates are based on tool default values and the following STEP recommendations:
* Native soil infiltration rates for Full, Partial and No Infiltration Design scenarios were assumed to be 20 mm/h, 10 mm/h and 2 mm/h, respectively, and a safety factor of 2.5 was applied to calculate the design infiltration rate.
* Native soil infiltration rates for Full, Partial and No Infiltration Design scenarios were assumed to be 20 mm/h, 10 mm/h and 2 mm/h, respectively, and a safety factor of 2.5 was applied to calculate the design infiltration rate.