Above you can find a cost breakdown of a 1000m<sup>2</sup> in two different configurations:<br>
Above you can find a cost breakdown of a 1000m<sup>2</sup> LID configuration:<br>
#[[Enhanced swales|Enhanced Swales: Full Infiltration]]  
#[[Enhanced swales|Enhanced Swales: Full Infiltration]]  


As can be seen, regardless of design configuration, Material & Installation expenses represent the largest portion of total construction costs (50%).
Material & Installation expenses represent the largest portion of total construction costs (50%).