| ==Construction Costs== | | ==Construction Costs== |
|
| |
|
| [[File:Construction Breakdown RWH No Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Treatment''']] | | [[File:Construction Breakdown VegStrip Full Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']] |
|
| |
|
|
| |
|
Line 35: |
Line 35: |
|
| |
|
|
| |
|
| Above you can find a cost breakdown of a below-ground concrete cistern that possesses a 50,000L capacity limit in the following configurations type:<br> | | Above you can find a cost breakdown of vegetated filter strips in the following configuration type:<br> |
| #[[Rainwater harvesting|Rainwater Harvesting: No Infiltration]] | | #[[Vegetated filter strips|Vegetated Filter Strips: Full Infiltration]] |
|
| |
|
| The Material & Installation expenses represent the largest portion of total construction costs (84%). | | The Material & Installation expenses represent the largest portion of total construction costs (55%). |
|
| |
|
| ==Life Cycle Costs== | | ==Life Cycle Costs== |