Changes

Jump to navigation Jump to search
Line 171: Line 171:
|Partial-based on available storage, native soil infiltration rate and if a flow restrictor is used
|Partial-based on available storage, native soil infiltration rate and if a flow restrictor is used
|-
|-
|'''Permeable Interlocking Pavements'''
|'''Permeable pavement with underdrain and impermeable liner'''
|No-some volume reduction occurs through evaporation
|No-some volume reduction occurs through evaporation
|Yes-size for water quality storage requirement
|Yes-size for water quality storage requirement

Navigation menu