Changes

Jump to navigation Jump to search
Line 50: Line 50:

Permeable pavements should be located down-gradient from building foundations. If the pavement does not receive drainage from other surfaces, no setback is required. If the pavement receives drainage from other surfaces a minimum setback of four metres down-gradient is recommended. A smaller setback may be permissible where foundations are protected by a geomembrane.
Permeable pavements should be located down-gradient from building foundations. If the pavement does not receive drainage from other surfaces, no setback is required. If the pavement receives drainage from other surfaces a minimum setback of four metres down-gradient is recommended. A smaller setback may be permissible where foundations are protected by a geomembrane.
The use of permeable pavement on highway shoulders has been found to be technically feasible and can be cost-effective when compared to conventional practices.


===Site Topography===
===Site Topography===

Navigation menu