Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Smart Blue Roof - Project Overview (Summary)
(view source)
Revision as of 01:50, 28 September 2023
2 bytes added
,
1 year ago
→Station 1 – Roof Surface
Line 15:
Line 15:
*Water can be stored on the roof for up to six (6) days.
*Water can be stored on the roof for up to six (6) days.
*The roof assembly includes a polymethyl methacrylate (PMMA) membrane, which is applied like paint and has no seams.
*The roof assembly includes a polymethyl methacrylate (PMMA) membrane, which is applied like paint and has no seams.
*The roof assembly is equipped with an electric field vector mapping (
EFVM
) leak detection system that can locate leaks with “pin-point” accuracy.
*The roof assembly is equipped with an electric field vector mapping (
EFVM®
) leak detection system that can locate leaks with “pin-point” accuracy.
=='''Station 2 – Modulating Control Valves'''==
=='''Station 2 – Modulating Control Valves'''==
JamesCowan
426
edits
Navigation menu
Personal tools
English
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version