Changes

Jump to navigation Jump to search
Line 22: Line 22:
#the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP.
#the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP.
===Designing with constraints===
===Designing with constraints===
{{TextBox|1= Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
{{textbox|Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
*[[Bioretention: Internal water storage |Bioretention with internal water storage]]
*[[Bioretention: Internal water storage |Bioretention with internal water storage]]
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
*[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]
}}
}}


{{TextBox|1= Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
{{textbox| Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:
*[[Bioretention: Non-infiltrating | Stormwater planters]]
*[[Bioretention: Non-infiltrating | Stormwater planters]]
*[[Rainwater harvesting]]
*[[Rainwater harvesting]]
*[[Green roofs]]
*[[Green roofs]]
}}
}}
----
 
===Planning===
===Planning===
NEW CONTENT HERE?
NEW CONTENT HERE?

Navigation menu