Changes

Jump to navigation Jump to search
Line 35: Line 35:
==Planning==
==Planning==
NEW CONTENT HERE?
NEW CONTENT HERE?
Needs advice on setbacks adding.


<h4>Soil infiltration rate</h4>
<h4>Soil infiltration rate</h4>
Line 54: Line 55:
|}
|}


<table class="table-responsive table table-striped">
 
        <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>
        <tr class="success">
            <th rowspan="2"  class="text-center">Catchment area</th>
            <th colspan="3" class="text-center">Consequence of failure</th>
            <tr class="success">
                <th  class="text-center">No damage or inconvenience</th>
                <th  class="text-center">Minor damage or inconvenience to external structures (e.g. ponding in parking lot)</th>
                <th  class="text-center">Significant damage to buildings or infrastructure (e.g. flooding damage)</th>
            </tr>
            <tr>
                <td  class="text-center"><100 m<sup>2</sup></td>
                <td  class="text-center">1.5</td>
                <td  class="text-center">2</td>
                <td  class="text-center">10</td>
            </tr>
            <tr>
                <td style="white-space: nowrap"  class="text-center"> 100 - 1000 m<sup>2</sup>
                    <td  class="text-center">1.5</td>
                    <td  class="text-center">3</td>
                    <td  class="text-center">10</td>
            </tr>
</table>
[[category:Infiltration]]
[[category:Infiltration]]

Navigation menu