Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:
;Aggregate
;Aggregate
:A broad category of particulate material used in construction, including sand, gravel, crushed stone, slag, recycled concrete and geosynthetic aggregates, and available in various particulate size gradations.
:A broad category of particulate material used in construction, including sand, gravel, crushed stone, slag, recycled concrete and geosynthetic aggregates, and available in various particulate size gradations.
;Antecedent dry period
:The period of time between consecutive rainfall events.


;Berm
;Berm
Line 124: Line 127:
;Inline
;Inline
:Refers to a system that accepts all of the flow from a drainage area and conveys larger event flows through an overflow outlet.
:Refers to a system that accepts all of the flow from a drainage area and conveys larger event flows through an overflow outlet.
;Interception
:The interception, storage and eventual evaporation of rainfall from vegetation canopies.


;I/P ratio
;I/P ratio
Line 215: Line 221:
;TSS
;TSS
:Total suspended solids
:Total suspended solids
;Time of concentration
:The time needed for a drop of water to reach the outlet of a catchment from the most remote location within the catchment.


;Treatment Train Approach
;Treatment Train Approach
40

edits

Navigation menu