Line 24: |
Line 24: |
|
| |
|
| <h3>Materials</h3> | | <h3>Materials</h3> |
| | <h4>Stone Reservoir</h4> |
| | The stone reservoir must meet both runoff storage and structural support requirements. |
| | The bottom of the reservoir should be level so that water infiltrates evenly. If the system is not designed for infiltration, the bottom should slope at 1 - 5% toward the underdrain. |
| | |
| | A hybrid permeable pavement/soakaway design can feature connection of a roof downspout directly to the stone reservoir of the permeable pavement system, which is sized to store runoff from both the pavement surface and the roof drainage area. |
| | |
| <h4>Geotextile</h4> | | <h4>Geotextile</h4> |
| {{:Geotextiles}} | | {{:Geotextiles}} |