| *''i'' = Infiltration rate for native soils (m/day) | | *''i'' = Infiltration rate for native soils (m/day) |
| *''T'' = Time to fill stone bed (typically 2 hr) | | *''T'' = Time to fill stone bed (typically 2 hr) |
| *''Vr'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. stone)}} | | *''Vr'' = Void ratio for stone bed (typically 0.4 for 50 mm dia. stone) |
|
| |
|
| Note that the contributing drainage area (Ac) should not contain pervious areas. | | Note that the contributing drainage area (Ac) should not contain pervious areas. |
Line 66: |
Line 66: |
| <math>dr_{max} = [i \times ts] / Vr </math> | | <math>dr_{max} = [i \times ts] / Vr </math> |
| Where: | | Where: |
| {{plainlist| | | {{plainlist|}} |
| *''dr<sub>max'' = Maximum stone reservoir depth (m) | | *''dr<sub>max'' = Maximum stone reservoir depth (m) |
| *''i'' = Infiltration rate for native soils (m/hr) | | *''i'' = Infiltration rate for native soils (m/hr) |
| *''Vr'' = Void space ratio for aggregate used (typically 0.4 for 50 mm clear stone) | | *''Vr'' = Void space ratio for aggregate used (typically 0.4 for 50 mm clear stone) |
| *''ts'' = Time to drain (design for 48 hour time to drain is recommended)}} | | *''ts'' = Time to drain (design for 48 hour time to drain is recommended) |
|
| |
|
| The value for native soil infiltration rate (i) used in the above equations should be the design infiltration rate that incorporates a safety correction factor based on the ratio of the mean value at the proposed bottom elevation of the practice to the mean value in the least permeable soil horizon within 1.5 metres of the proposed bottom elevation | | The value for native soil infiltration rate (i) used in the above equations should be the design infiltration rate that incorporates a safety correction factor based on the ratio of the mean value at the proposed bottom elevation of the practice to the mean value in the least permeable soil horizon within 1.5 metres of the proposed bottom elevation |