Changes

Jump to navigation Jump to search
no edit summary
Line 14: Line 14:
===Reduce roadway setbacks and lot frontages===
===Reduce roadway setbacks and lot frontages===
The lengths of setbacks and frontages are a determinant for the area of pavement, street, driveways, and walkways, needed to service a development. Municipal zoning regulations for setbacks and frontages have been found to be a significant influence on the production of stormwater runoff. A study of residential parcels in Madison, Wisconsin found that reducing setbacks by 3 m and frontages by 5.5 m resulted in a 14% reduction of stormwater runoff (Stone and Bullen, 2006).
The lengths of setbacks and frontages are a determinant for the area of pavement, street, driveways, and walkways, needed to service a development. Municipal zoning regulations for setbacks and frontages have been found to be a significant influence on the production of stormwater runoff. A study of residential parcels in Madison, Wisconsin found that reducing setbacks by 3 m and frontages by 5.5 m resulted in a 14% reduction of stormwater runoff (Stone and Bullen, 2006).
==References==
<references/>
[[category: planning]]

Navigation menu