Changes

Jump to navigation Jump to search
Line 8: Line 8:
potential stormwater BMPs. The designer should prepare maps describing site
potential stormwater BMPs. The designer should prepare maps describing site


conditions, to ensure that all environmental features and functions that need
conditions to ensure that all environmental features and functions that need


consideration in accordance with provincial, municipal and conservation authority
consideration in accordance with provincial, municipal and conservation authority
Line 20: Line 20:
native soil types, infiltration capacity and depth to water table must be determined.
native soil types, infiltration capacity and depth to water table must be determined.


In retrofit scenarios, land use type such as road right of ways, industrial, commercial and institutional should be noted.


=== Define Design Criteria ===
=== Define Design Criteria ===
187

edits

Navigation menu