Line 38:
Line 38:
*A warranty on the vegetation should be included in the construction contract.
*A warranty on the vegetation should be included in the construction contract.
*Plants should be replaced as needed to ensure complete coverage and not just at the end of the warranty.
*Plants should be replaced as needed to ensure complete coverage and not just at the end of the warranty.
[[category:Materials]]
[[category:Green infrastructure]]
[[category:Construction]]
[[category:Landscaping]]