#Quality treatment provided using an oil/grit separator immediately upstream of each of the infiltration chambers, filtration through the infiltration chamber, and finally a stormwater management facility provided prior to discharging from the site.
#Quality treatment provided using an oil/grit separator immediately upstream of each of the infiltration chambers, filtration through the infiltration chamber, and finally a stormwater management facility provided prior to discharging from the site.
#Final erosion control provided within the stormwater management facility, controlling release rates to maintain the existing condition erosion exceedance values.
#Final erosion control provided within the stormwater management facility, controlling release rates to maintain the existing condition erosion exceedance values.
*Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control for rare storm events up to the *100-year design storm. Due to large area required for truck parking, limited opportunities for more landscaping to promote evapotranspiration, runoff volumes increased beyond ability of LIDs to negate the need for quantity control.
#Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control for rare storm events up to the 100-year design storm. Due to large area required for truck parking, limited opportunities for more landscaping to promote evapotranspiration, runoff volumes increased beyond ability of LIDs to negate the need for quantity control.


<h3>Example 2. West Gormley, Town of Richmond Hill</h3>
<h3>Example 2. West Gormley, Town of Richmond Hill</h3>
Line 90: Line 90:
#Quality target achieved as majority of site is ‘clean’ roof water or directed to pervious area. Underground storage tank provided to satisfy municipal release rates to receiving storm sewer system.
#Quality target achieved as majority of site is ‘clean’ roof water or directed to pervious area. Underground storage tank provided to satisfy municipal release rates to receiving storm sewer system.
#Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control to meet municipal requirements.
#Final design required both LIDs to reduce the overall runoff volumes, but also sub-surface storage chambers to provide quantity control to meet municipal requirements.
Due to underground parking limited opportunities for infiltration LIDs but used green roof to promote evapotranspiration, and cistern to reduce runoff volumes.
#Due to underground parking limited opportunities for infiltration LIDs but used green roof to promote evapotranspiration, and cistern to reduce runoff volumes.


==Data Analysis/Modelling==