Changes

Jump to navigation Jump to search
Line 31: Line 31:
*Minimum length 30 m
*Minimum length 30 m


{|class="wikitable"
 
|+ Slope variations
 
|-
 
|< 2 %||Use underdrain to distribute water for infiltration
===Adding check dams===
|-
To calculate the spaing and sizing of check dams, see [[Check dams: Sizing]]
|2 - 5 %||Design swale for surface flow, consider check dams
 
|-
 
||5 %||Check dams required to reduce effective slope to 2 – 3 %
 
|}


Maximum depth of flow
Maximum depth of flow

Navigation menu