Changes

Jump to navigation Jump to search
no edit summary
Line 4: Line 4:
*Heavy Vehicles: Trucks and other heavy vehicles can ground dirt into the porous surface and lead to clogging. These vehicles should be prevented from tracking or spilling dirt onto the pavement. Signage and training of facilities personnel is suggested. <ref>Philadelphia Water Department (PWD). 2007. Philadelphia Stormwater Management Guidance Manual. Philadelphia, PA.</ref>
*Heavy Vehicles: Trucks and other heavy vehicles can ground dirt into the porous surface and lead to clogging. These vehicles should be prevented from tracking or spilling dirt onto the pavement. Signage and training of facilities personnel is suggested. <ref>Philadelphia Water Department (PWD). 2007. Philadelphia Stormwater Management Guidance Manual. Philadelphia, PA.</ref>
*Construction and Hazardous Materials: Due to the potential for groundwater contamination, all construction or hazardous material carriers should be prohibited from entering a permeable pavement site•<ref>Philadelphia Water Department (PWD). 2007. Philadelphia Stormwater Management Guidance Manual. Philadelphia, PA.</ref>
*Construction and Hazardous Materials: Due to the potential for groundwater contamination, all construction or hazardous material carriers should be prohibited from entering a permeable pavement site•<ref>Philadelphia Water Department (PWD). 2007. Philadelphia Stormwater Management Guidance Manual. Philadelphia, PA.</ref>
*Drainage Areas: Impervious areas contributing to the permeable pavement should be regularly swept and kept clear of litter and debris. Flows from any landscaped areas should be diverted away from the
*Drainage Areas: Impervious areas contributing to the permeable pavement should be regularly swept and kept clear of litter and debris.Flows from any landscaped areas should be diverted away from the pavement or at least be well stabilized with vegetation.
pavement or at least be well stabilized with vegetation.  
*Grid Pavers: Paver or grid systems that have been planted with grass should be mowed regularly and the clippings should be removed (PWD, 2007). Water and fertilize as needed.  
*Grid Pavers: Paver or grid systems that have been planted with grass should be mowed regularly and the clippings should be removed (PWD, 2007). Water and fertilize as needed.  
*Seal Coating: Seal coats should never be applied to permeable pavements. Current and future owners and operations staff must be aware of permeable pavement areas and the importance of not applying  
*Seal Coating: Seal coats should never be applied to permeable pavements. Current and future owners and operations staff must be aware of permeable pavement areas and the importance of not applying any sealants. Porous asphalt and pervious concrete look very similar to their impervious versions and could be inadvertently sealed over.  
any sealants. Porous asphalt and pervious concrete look very similar to their impervious versions and could be inadvertently sealed over.  
*Potholes: For porous asphalt or pervious concrete, isolated potholes can be patched with standard patching mixes. Patching can continue until the structural integrity of the pavement has been compromised or stormwater can no longer drain to the aggregate base. Then the surface will need to be torn up and replaced.  
*Potholes: For porous asphalt or pervious concrete, isolated potholes can be patched with standard patching mixes. Patching can continue until the structural integrity of the pavement has been compromised or stormwater can no longer drain to the aggregate base. Then the surface will need to be torn up and replaced.  
*Uneven Pavers: An uneven paver surface can be repaired by pulling up the pavers, redistributing the bedding layer, and then placing the pavers back. New filler stone will need to be swept into the  
*Uneven Pavers: An uneven paver surface can be repaired by pulling up the pavers, redistributing the bedding layer, and then placing the pavers back. New filler stone will need to be swept into the replaced pavers. Typically the pavers are packed very tightly, and breaking one or more pavers will be necessary to pull up a group of pavers. Keeping a set of replacement pavers after construction will be useful for making future repairs.
replaced pavers. Typically the pavers are packed very tightly, and breaking one or more pavers will be necessary to pull up a group of pavers. Keeping a set of replacement pavers after construction will be useful for making future repairs.
*Weeds: Over time, weed growth may become a problem, particularly on surfaces with infrequent traffic. Weeds can be an aesthetic issue and may also reduce the infiltration through the pavement. Keeping the pavement surface free of organic material through regular sweeping and vacuuming can impede weeds from taking root. Pulling weeds when they are small will limit damage to the pavement and loss of filler material between pavers. Ontario has banned the use of cosmetic herbicides.  
*Weeds: Over time, weed growth may become a problem, particularly on surfaces with infrequent traffic. Weeds can be an aesthetic issue and may also reduce the infiltration through the pavement.
*Winter Maintenance: Sand should not be spread on permeable pavement as it can quickly lead to clogging. Deicers should only be used in moderation and only when needed because dissolved constituents are not removed by the pavement system. Pilot studies at the University of New Hampshire Stormwater Center have found that permeable pavement requires 75% less salt than conventional pavement over the course of a typical winter season.<ref>University of New Hampshire Stormwater Center (UNHSC). 2007. 2007 Annual Report. Durham, NH.</ref>
Keeping the pavement surface free of organic material through regular sweeping and vacuuming can impede weeds from taking root. Pulling weeds when they are small will limit damage to the pavement  
and loss of filler material between pavers. Ontario has banned the use of cosmetic herbicides.  
*Winter Maintenance: Sand should not be spread on permeable pavement as it can quickly lead to clogging. Deicers should only be used in moderation and only when needed because dissolved  
constituents are not removed by the pavement system. Pilot studies at the University of New Hampshire Stormwater Center have found that permeable pavement requires 75% less salt than conventional pavement over the course of a typical winter season <ref>University of New Hampshire Stormwater Center (UNHSC). 2007. 2007 Annual Report. Durham, NH.</ref>
*Snow Plowing: Permeable pavement is plowed for snow removal like any other pavement. When groundwater contamination from chlorides is a concern, plowed snow piles and snow melt should not be directed to permeable paver and porous pavement systems<ref>Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design,
*Snow Plowing: Permeable pavement is plowed for snow removal like any other pavement. When groundwater contamination from chlorides is a concern, plowed snow piles and snow melt should not be directed to permeable paver and porous pavement systems<ref>Smith, D. 2006. Permeable Interlocking Concrete Pavements; Selection, Design,
Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute.Burlington, ON.</ref><br><br>
Construction, Maintenance. 3rd Edition. Interlocking Concrete Pavement Institute.Burlington, ON.</ref><br>
Annual inspections of permeable pavement should be conducted in the spring to ensure continued infiltration performance. These inspections should check for spilling or deterioration and test to whether water is draining between storms. The pavement reservoir should drain completely within 72 hours of the end of the storm event.
Annual inspections of permeable pavement should be conducted in the spring to ensure continued infiltration performance. These inspections should check for spilling or deterioration and test to whether water is draining between storms. The pavement reservoir should drain completely within 72 hours of the end of the storm event.
===References===
===References===

Navigation menu