* Void ratio = 14% - 31%
* Void ratio = 14% - 31%
* Permeability = 900 - 21,500 mm/hr
* Permeability = 900 - 21,500 mm/hr
|Thickness will range from 100 mm-150 mm depending on the expected loads
|Thickness will range from 100 mm - 150 mm depending on the expected loads
|-
|-
|'''Porous Asphalt'''
|'''Porous Asphalt'''
|
|
* open-graded asphalt mix with a minimum of 16% air voids  
* open-graded asphalt mix with a minimum of 16 % air voids  
* Polymer can be added to provide additional strength to heavy loads
* Polymer can be added to provide additional strength to heavy loads
|Thickness will range from 50 mm-100 mm depending on the expected loads
|Thickness will range from 50 mm - 100 mm depending on the expected loads
|-
|-